PROJECTS

CONSTRUCTIONS

INFRASTRUCTURE

OTHER PROJECTS

HomePresentation


HOW TO REACH THE
IAC CAMPUS


HOSPEDARIUM


SHARE ON SOCIAL NETWORKS

|


Photovoltaic System data

Lead Time Produced:
6 years: 2 months: 21 days

± Kwh Produced: 38,455 Kwh
± Kg CO2 Saved: 15,381.96 Kg
± Kg SO2 Saved: 769.10 Kg
± Kg NOx Saved: 384.55 Kg

Data update automatically daily
CO2: Carbon Dioxide
SO2: Sulfur Dioxide
NOx: Nitrogen Oxides

Production Higtchart

Presentation

These pages provide specific information regarding some projects planned to be built and implemented at IAC Research Campus, as well as information and image galleries of already concluded projects.

You can find the links to all available content about IAC Campus’ projects in the column on the right.

Please visit the following links for more details on the institution, its mission, goals, and research projects:

Thank you for your visit,

IAC Campus Development Department

Images of the IAC Campus Constructions and Infrastructures

Hospedarium at the IAC Campus

Laboratories: Sunrise in fog

Inside of the Projectarium

Phytolab

Immobilitarium and behind Projectarium

Photovoltaic System at the IAC Campus


Images of the IAC Campus Nature

Spring on the IAC Campus

Hydroenergy on the IAC Campus

Spring on the IAC Campus

Phytoenergy on the IAC Campus: There are about 340 trees (cork and oaks)

Zooenergy - Spider web